Vertical Concrete Elements Striking Times: Maturity method and Uruguay Survey

For the construction of vertical concrete elements temporary structures called formwork are used. Their use represents one of the higher cost that construction companies has affront and in some cases may rise up to 60% of the total cost of the concrete. In this article the results of a sur...

Full description

Saved in:
Bibliographic Details
Main Author: Rudeli, Natalia (author)
Other Authors: Santilli, Adrián (author)
Format: article
Language:Spanish
Published: 2014
Subjects:
Online Access:http://revistas.um.edu.uy/index.php/ingenieria/article/view/348
Tags: Add Tag
No Tags, Be the first to tag this record!