Vertical Concrete Elements Striking Times: Maturity method and Uruguay Survey

For the construction of vertical concrete elements temporary structures called formwork are used. Their use represents one of the higher cost that construction companies has affront and in some cases may rise up to 60% of the total cost of the concrete. In this article the results of a sur...

Fuld beskrivelse

Saved in:
Bibliografiske detaljer
Hovedforfatter: Rudeli, Natalia (author)
Andre forfattere: Santilli, Adrián (author)
Format: article
Sprog:spansk
Udgivet: 2014
Fag:
Online adgang:http://revistas.um.edu.uy/index.php/ingenieria/article/view/348
Tags: Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!

Lignende værker: Vertical Concrete Elements Striking Times: Maturity method and Uruguay Survey