Vertical Concrete Elements Striking Times: Maturity method and Uruguay Survey
For the construction of vertical concrete elements temporary structures called formwork are used. Their use represents one of the higher cost that construction companies has affront and in some cases may rise up to 60% of the total cost of the concrete. In this article the results of a sur...
Saved in:
| Hovedforfatter: | |
|---|---|
| Andre forfattere: | |
| Format: | article |
| Sprog: | spansk |
| Udgivet: |
2014
|
| Fag: | |
| Online adgang: | http://revistas.um.edu.uy/index.php/ingenieria/article/view/348 |
| Tags: |
Ingen Tags, Vær først til at tagge denne postø!
|
Lignende værker: Vertical Concrete Elements Striking Times: Maturity method and Uruguay Survey
- Vertical formwork design: Dimensioning and Minimum Demoulding Times
- Comparison between the experimental models to determine the maximum lateral pressure in self-compacting concrete
- Optimisation of formwork stripping time in vertical self-compacting concrete parts
- Lateral Pressure in Columns: Experimental Measurements
- Validation of an expert system for inventory replenishment using case studies
- Influence of concrete curing on concrete compressive strength: an experimental study