Multistage stochastic capacitated discrete lot-sizing with lead times: problem definition, complexity analysis and tighter formulations

A stochastic capacitated discrete procurement problem with lead times, cancellation and postponement is addressed. The problem determines the expected cost minimization of satisfying the uncertain demand of a product during a discrete time planning horizon. The supply of the product is made through...

Full description

Saved in:
Bibliographic Details
Main Author: Testuri, Carlos E. (author)
Format: doctoralThesis
Language:English
Published: 2020
Subjects:
Online Access:https://hdl.handle.net/20.500.12008/23432
Tags: Add Tag
No Tags, Be the first to tag this record!